Construction of a photovoltaic installation according to a project
Project title: "Loss of a photovoltaic installation with an output AC power of the inverter 210kW for the production of energy from renewable sources for Physical demand in combination with local power supply (batteries) with the capacity of the accumulator/s battery/s: 215 kW", Homep on point: no. BG-RRPP-3.006-0104
Stages after completion of the investment:
1. Commissioning
- Installation and start of electricity production for own consumption.
- Verification of compliance with technical parameters, including minimum yield.
2. Reporting to the governing body
- Submission of final technical and financial report.
- Submission of evidence of activities performed, expenditures and results achieved.
3. Publicity and visualization
- Maintenance of an information poster or table with data on the project and the financing from the Recovery and Sustainability Mechanism.
4. Monitoring and sustainability
- Compliance with the requirement for sustainability of results for a period of at least 5 years.
- Measurement and monitoring of energy production, reduced emissions and technical integrity of equipment.
Objectives to be achieved:
Efficient use of electricity production to reduce costs and energy dependence.
Reduction of greenhouse gas emissions through the transition to clean energy.
Maintaining environmental and technical standards, in accordance with the principle of “doing no significant harm”.
Ensuring transparency and accountability for the use of financial support from the Recovery and Resilience Facility.
"This publication has been produced with the financial support of the European Union – NextGenerationEU. The sole responsibility for the content of the document lies with the final recipient and under no circumstances can it be assumed that this document reflects the official position of the European Union and the CD."